SPS 318.1004(16) (16)“Replacement" means the substitution of a device, component, or subsystem, in its entirety, with a unit that is basically the same as the original for the purpose of ensuring performance in accordance with the applicable requirements of this chapter.
SPS 318.1004 History History: CR 14-020: cr. Register August 2014 No. 704, eff. 9-1-14; CR 19-118: cr. (4m), am. (6), (7), renum. (10) (a) to (10) (ar), cr. (10) (ag), am. (10) (g), (i), (L), r. (10) (n), cr. (10) (om), (12e), (12m), (12s) Register May 2020 No. 773, eff. 6-1-20.
SPS 318.1005 SPS 318.1005Adoption of standards by reference.
SPS 318.1005(1)(1)Primary standards. The following standards are hereby incorporated by reference into this chapter, subject to the modifications specified in this chapter:
SPS 318.1005(1)(a) (a) Safety Code for Elevators and Escalators, ASME A17.1–2016/CSA B44–16.
SPS 318.1005(1)(b) (b) Safety Standard for Platform Lifts and Stairway Chairlifts, ASME A18.1–2017.
SPS 318.1005(1)(c) (c) Entertainment Technology-Design, Installation, and Use of Orchestra Pit Lifts, ANSI E1.42-2018.
SPS 318.1005(2) (2) Secondary references. Any codes or standards referenced in the standards adopted in sub. (1) shall apply to the prescribed extent of each such reference, except as modified by this chapter.
SPS 318.1005(3) (3) Alternate standards. Any alternate standard that is equivalent to or more stringent than a standard incorporated by reference or otherwise referenced under this chapter may be used in lieu of the incorporated or referenced standard if the alternate standard is accepted in writing by the department.
SPS 318.1005 History History: CR 14-020: cr. Register August 2014 No. 704, eff. 9-1-14; CR 19-118: am. (1) (intro), (a), (b), cr. (c) Register May 2020 No. 773, eff. 6-1-20.
subch. III of ch. SPS 318 Subchapter III — Administration and Enforcement
SPS 318.1006 SPS 318.1006Fees. Fees for plan review, permit application, inspection, permit to operate, and other services performed by the department pertaining to elevators, escalators, and lift devices shall be as determined in ch. SPS 302.
SPS 318.1006 History History: CR 03-047: cr. Register March 2004 No. 579, eff. 4-1-04; CR 07-089: am. Register June 2008 No. 630, eff. 1-1-09; correction made under s. 13.92 (4) (b) 7., Stats., Register December 2011 No. 672; CR 14-020: r. and recr. Register August 2014 No. 704, eff. 9-1-14.
SPS 318.1007 SPS 318.1007Plan review and approval.
SPS 318.1007(1)(1)Approvals.
SPS 318.1007(1)(a)1.1. Before commencing the construction or installation of a conveyance, an approval shall be obtained from the department or agent municipality within whose boundaries the conveyance is to be located.
SPS 318.1007(1)(a)2. 2. Before commencing an alteration of an existing conveyance as delineated in Tables SPS 318.1007-1 to 318.1007-4, an approval shall be obtained from the department or agent municipality within whose boundaries the conveyance is located.
SPS 318.1007(1)(b) (b) Pursuant to s. 101.983 (1) (a), Stats., the approval issued by the department or agent municipality shall be considered a permit.
SPS 318.1007(2) (2) New installations.
SPS 318.1007(2)(a)(a) Number of plans.
SPS 318.1007(2)(a)1.1. When seeking an approval from the department, at least 3 copies of plans and one set of specifications shall be submitted for review for a new conveyance installation, except as provided in subd. 2.
SPS 318.1007(2)(a)2. 2. In lieu of 3 copies of an installation plan, a plan in an electronic format acceptable to the department may be submitted.
SPS 318.1007 Note Note: An acceptable electronic format does not include a facsimile.
SPS 318.1007(2)(b) (b) Level of detail. An installation plan submitted for review shall be of sufficient clarity and detail to show how the proposed design will conform to this chapter.
SPS 318.1007(2)(c) (c) Material to submit.
SPS 318.1007(2)(c)1.1. `Plan submittals.' A plan submittal to the department for installation approval shall be accompanied by all of the following:
SPS 318.1007(2)(c)1.a. a. At least 3 copies of the completed application, on an approved form.
SPS 318.1007 Note Note: Forms required under this chapter are available on the department's website at https://dsps.wi.gov, or by request from the Department of Safety and Professional Services, P. O. Box 7302, Madison, Wisconsin 53708, or call (608) 266-2112.
SPS 318.1007(2)(c)1.b. b. A plan review fee.
SPS 318.1007(2)(c)1.c. c. An acceptance-inspection fee.
SPS 318.1007(2)(c)1.d. d. The initial permit-to-operate fee.
SPS 318.1007(2)(c)1.e. e. Sufficient information, calculations, or data to substantiate compliance with this chapter.
SPS 318.1007(2)(c)2. 2. `Elevators or dumbwaiters.' For an elevator or dumbwaiter, submitted materials shall include the information in the layout-drawings section in the applicable Part of ASME A17.1, and at least all of the following:
SPS 318.1007(2)(c)2.a. a. A plan of the car and hoistway showing all clearances, including all inside car or platform dimensions, as specified in this chapter and the building code.
SPS 318.1007(2)(c)2.b. b. A plan of the machine room, control room, or control space showing clearances around the machine, controller, and disconnecting means, as specified in this chapter, the building code, and the electrical code, where applicable.
SPS 318.1007(2)(c)2.c. c. A cross-section through the hoistway, pit, and car, showing all applicable dimensions.
SPS 318.1007(2)(c)2.d. d. The size and weight per foot of guiderails and details of their support, including reinforcements where required.
SPS 318.1007(2)(c)2.e. e. Landings indicating types of hoistway doors or gates.
SPS 318.1007(2)(c)3. 3. `Escalators or moving walks.' For an escalator or moving walk, plans submitted for review shall include all of the following:
SPS 318.1007(2)(c)3.a. a. A plan view showing step, pallet, or belt-treadway width and machine-space clearances.
SPS 318.1007(2)(c)3.b. b. An elevation view showing all applicable dimensions.
SPS 318.1007 Note Note: Under this subdivision, if the scope of work for an escalator includes a replacement of the majority of internal parts, the work is considered to be a new installation even if a majority of the truss is retained.
SPS 318.1007(2)(c)4. 4. `Vertical platform lifts.' For a vertical platform lift, plans submitted for review shall include all of the following:
SPS 318.1007(2)(c)4.a. a. A plan of the platform enclosure and runway including all inside platform dimensions and clearances specified in this chapter and the building code where applicable.
SPS 318.1007(2)(c)4.b. b. A section through the runway, pit, and platform showing all dimensions and clearances.
SPS 318.1007(2)(c)4.c. c. Landings indicating types of runway doors or gates. Where manual doors or gates are provided, plans showing the clearances at manual doors or gates meeting the building code.
SPS 318.1007(2)(c)5. 5. 'Inclined platform lifts or stairway chair lifts.' For an inclined platform lift or stairway chair lift, plans submitted for review shall include the following:
SPS 318.1007(2)(c)5.a. a. A plan of the lift shown in its unfolded operational position at each landing and on the stairway with egress past the lift dimensioned.
SPS 318.1007(2)(c)5.b. b. A section through the stairway or runway showing clearances to steps and overhead with the lift in its unfolded, usable position.
SPS 318.1007(2)(c)5.c. c. A calculation of egress width past the lift meeting the building code, prepared by a licensed architect or engineer, or evidence such calculation has been approved by the building code authority.
SPS 318.1007(3) (3) Scope of alterations, repairs, and replacements.
SPS 318.1007(3)(a) (a) For proposed alterations, repairs, or replacements listed in Table SPS 318.1007-1 Items 1. to 4. and Tables SPS 318.1007-2, 318.1007-3, and 318.1007-4, all of the following shall be submitted with the request for approval:
SPS 318.1007(3)(a)1. 1. At least 3 copies of the completed application, on an approved form, if the submittal is to the department.
SPS 318.1007 Note Note: Forms required under this chapter are available on the department's website at https://dsps.wi.gov, or by request from the Department of Safety and Professional Services, P. O. Box 7302, Madison, Wisconsin 53708, or call (608) 266-2112.
SPS 318.1007(3)(a)2. 2. At least 3 copies of bound equipment layout plans and specifications that conform to the applicable sections in ASME A17.1 or ASME A18.1.
SPS 318.1007(3)(a)3. 3. A plan review fee.
SPS 318.1007(3)(a)4. 4. An acceptance-inspection fee.
SPS 318.1007 Note Note: See chapter SPS 302 for the amount of the fee remitted to the department when a conveyance plan is filed.
SPS 318.1007(3)(a)5. 5. Sufficient data and information to determine if the proposed alteration complies with the requirements of this chapter.
SPS 318.1007(3)(b) (b) For proposed alterations listed in Table SPS 318.1007-1 Items 5. to 33., all of the following shall be submitted with the request for approval:
SPS 318.1007(3)(b)1. 1. At least 3 copies of the completed application, on an approved form, if the submittal is to the department.
SPS 318.1007(3)(b)2. 2. A plan review fee.
SPS 318.1007(3)(b)3. 3. An acceptance-inspection fee.
SPS 318.1007(3)(b)4. 4. Sufficient data and information to determine if the proposed alteration complies with this chapter.
Table SPS 318.1007-1
Elevators and Orchestra Pit Lifts - See PDF for table PDF - See PDF for table PDF
Table SPS 318.1007-2
Escalators and Moving Walks - See PDF for table PDF - See PDF for table PDF
Table SPS 318.1007-3
Dumbwaiters and Type B Material Lifts - See PDF for table PDF
Table SPS 318.1007-4
Platform Lifts - See PDF for table PDF
SPS 318.1007 Note Note: See chapter SPS 302 for fee requirements.
SPS 318.1007 History History: CR: 14-020: cr. Register August 2014 No. 704, eff. 9-1-14; correction in (2) (a) (title), (b) (title), (c) (title) made under s. 13.92 (4) (b) 2., Stats., Register August 2014 No. 704; CR 19-118: am. (2) (c) 1. a., (3) (title), (a) (intro.), 1., Table SPS 318.1007-1, Table SPS 318.1007-2, Table SPS 318.1007-3, Table SPS 318.1007-4 Register May 2020 No. 773, eff. 6-1-20.
SPS 318.1008 SPS 318.1008Plan review actions.
SPS 318.1008(1)(1)Processing. The department shall review and make a determination on a request for plan approval within 15 business days, except as provided in sub. (2) (d).
SPS 318.1008(2) (2) Determinations.
SPS 318.1008(2)(a)(a) Conditional approval.
SPS 318.1008(2)(a)1.1. If the department determines the application and plans for installation or alteration substantially comply with the provisions of this chapter, the department shall grant a conditional approval in writing.
SPS 318.1008(2)(a)2. 2. Non-code-complying conditions stated in the conditional approval shall be corrected before or during installation.
SPS 318.1008(2)(a)3. 3. A conditional approval issued by the department may not be construed as an assumption of any responsibility for the design or construction of the equipment.
SPS 318.1008(2)(a)4. 4. The issuance of a conditional approval by the department does not alleviate the responsibility to correct any non-code-complying condition, element, or component not specifically enumerated in a conditional approval.
SPS 318.1008(2)(b) (b) Revocation of approval. The department may revoke any approval issued by department if the department determines any of the following:
SPS 318.1008(2)(b)1. 1. That information provided for obtaining the approval contains false statements or misinterpretations of material fact.
SPS 318.1008(2)(b)2. 2. That the approval was issued in error.
SPS 318.1008(2)(b)3. 3. That the work performed is not consistent with the approval or is in violation of this chapter.
SPS 318.1008(2)(c) (c) Denial of approval. The request for plan approval shall be denied, in writing, if the department determines that the plans or the application do not substantially comply with the provisions of this chapter.
SPS 318.1008(2)(d)1.1. The request for plan approval shall be placed on hold if the department determines that the submittal is not of sufficient detail or missing information to determine whether the proposal conforms to this chapter.
SPS 318.1008(2)(d)2. 2. If the request for plan approval is placed on hold, the permit-processing timeframe in par. (a) shall also be interrupted until the appropriate information is submitted to complete the review, except the request for approval and the hold shall expire if the appropriate information is not submitted within 90 calendar days of being requested.
SPS 318.1008(2)(e) (e) Expiration. As required under s. 101.983 (1) (d), Stats., an approval issued under this chapter expires under any of the following circumstances:
SPS 318.1008(2)(e)1. 1. If the work authorized under the approval does not commence within 6 months after the date on which the approval is issued.